THE MOST EFFICIENT WIND FARM IN LUXEMBOURG
OEKOSTROUM WEILER
OekoStroum Weiler is a major windfarm situated in Weiler in the commune of Wincrange. The construction started in 2015. Since December 2016 the 7 windmills are operational.
OekoStroum Weiler is a reference in terms of size and technology used. Covering an aerea of 12ha, 7 Siemens windmills type SWT 3.0-113 will produce 51 500 000 kWh per year which correspond to the energetic consumption of 13 000 households.
In the perspective of the governmental environment objectives in 2020 OekoStroum Weiler will contribute 20% of the production capacity of all windpower in the Grand-Duchy and 0,8% of the overall renewable energy consumption.
Thus the CO2 emissions will be reduced by 55 000 000 kg compared to the production emissions of the coal plants.
The Commune of Wincrange who is a KlimaPact signatory was sustaining the project since its beginnings. In addition to the ecological aspect, OekoStroum Weiler has also a positive impact on the regional economy in contracting local firms and creating supplementary jobs.
For a viable and sustainable environment !

51 500 000 kwh
Estimated annual production

13 000 Households
supplied with electricity thanks to the wind farm

21 MW
Total power
Our videos
ADVANCED TECHNOLOGY
SIEMENS TURBINES SWT 3.0-113
With 7 wind turbines of the type Siemens SWT 3.0-113, Weiler, a small village belonging to the commune of Wintger hosts the most powerful wind farm in the country.
More information on www.siemens.lu/D3


ENVIRONMENTAL IMPACT
ENVIRONMENTAL IMPACT

55 000 000 kg
ENVIRONMENTAL IMPACT
REFORESTATION AND COMPENSATIONS TO PROTECT NATURE

DEFORESTATION
Deforestation of 3,3 hectares of monoculture forests (conifers)
REFORESTATION
Reforestation of 2,1 hectares of oaks and hornbeams
COMPENSATION
Renaturation of 2 ha in Eschweiler

Creating of feeding areas to keep red skite away from the wind farm to avoid any risk of collisions.
Acquisition of agricultural land and development of a specific mowing management concept on 21ha..

THE MAIN STEPS OF CONSTRUCTION
April
Infrastructure, foundations and wirings
3rd May
Site visit with the Communal Council of Wincrange
6th June
Information Meeting with the Citizens
Construction of the tower
August
Transport of the wings and nacelles
Set up of the largest crane in Europe
October
Installation of the first wind turbin
Press conference
December
Beginning of production
Spring 2017
Inauguration
BONDS OPEN TO CITIZENS

1 million € in bonds managed to citizens

The location of the wind farm
CONTACT
DO NOT HESITATE TO CONTACT US
CONTACT ADDRESS
OEKOSTROUM WEILER
Maison 154
Kéimicht Haff
L-9960 Hoffelt
Tel : +352 26 74 31 36
Email : info@oekostroum.lu